2.

 

Insert one end of the assembled arch into one base plate and force the other end 
of the arch into the opposite base plate.  

 

Figure 4 

3.

 

After installing the first two arches, connect the 

Purlin 

(part code 4) onto them 

using the 

Bolts M10x80

 (part code 12). There are 7 pieces of 

Purlins

 (part code 4) 

between each arch. 

4.

 

Install the Inclined 

Top tension device

 (part code 5) using the 

Clips 

(part code 6). 

 

Figure 5 

5.

 

Then install the third arch into the base plate and connect the purlins. 

6.

 

Assemble the arches one by one until the frame is finished.  

Summary of Contents for DT Container shelter

Page 1: ...1 SHELTER ASSEMBLY MANUAL 40x80x15 DT Container shelter Double Truss...

Page 2: ...p tensioning device 16 6 Clips 32 7A Left base plate 11 7B Right base plate 11 8 Ratchet 22 9 Nylon band for ratchet 22 10 Tensioning tube 2 groups 11 Bolts M8x70 176 0 Bolts M12x30 132 12 Bolts M10x8...

Page 3: ...steel into the hole making sure 3ft is below the surface completely laying on the side of the containers 3 Weld the square steel to the 2 containers 4 Pour cement in the holes to make sure the square...

Page 4: ...of Single truss framing Customer responsibility 4 It s the owner s responsibility to shovel snow off the canopy rooftop 5 All containers need to be anchored to the ground in each opposite corner sides...

Page 5: ...y to take off snow immediately otherwise it will slide off on its own READ ALL INSTRUCTIONS BEFORE ASSEMBLY 1 Keep the work area clean Accidents are more likely in cluttered areas Do not set up near s...

Page 6: ...LATION PROCESS A BASE PLATES INSTALLATION Please refer to the Figure 1 to place the base plates Figure 1 1 The measure must be taken from center to center of the base plates Refer to the diagram above...

Page 7: ...e Top Bent Tube part code 1 the Side Bent Tube part code 2 and the Lower Bent Tube part code 3 with the Bolts M8x70 part code 11 these make one group of arches Please NOTE the direction of the bolt DO...

Page 8: ...rches connect the Purlin part code 4 onto them using the Bolts M10x80 part code 12 There are 7 pieces of Purlins part code 4 between each arch 4 Install the Inclined Top tension device part code 5 usi...

Page 9: ...e pull the cover up over the arches with the breeze blowing in the cover like a sail filled with air 1 Insert the Tensioning tube part code 10 into the pockets on the end of the roof cover part code 1...

Page 10: ...e Nylon band for ratchet part code 9 to tie down the Tensioning tubes Figure 8 4 Weld the Angle seats part code 16 on each container and use Knitting Rope for Cover part code 14 to knit the cover on t...

Page 11: ...HED UNDER ANYCIRCUMSTANCES until the final assembly and tightening has been completed The process is quite easy but some tightening adjustments will be necessary to get a flat tensioned roof cover Ple...