background image

 

 

EQUIPMENT AND TOOLS FOR INSTALLATION 

1. 

Measuring tape

 

2.

 

Alignment string 

3. 

Step ladder

 

4. 

Welder

 

5. 

Sledgehammer

 

6. 

Wrench

 

7. 

Scissors

 

INSTALLATION PROCESS 

 

A - BASE PLATES INSTALLATION 

Please refer to the Figure 1 to place the base plates. 

 

Figure 1 

1.

 

The measure must be taken from center to center of the base plates. Refer to the 
diagram above and confirm the place of the base plates. ENSURE THAT THE 
FOUNDATIONS ARE SQUARE. 

2.

 

All the base plates need to be welded on the Containers. 

 

Summary of Contents for 40x80x15

Page 1: ...1 SHELTER ASSEMBLY MANUAL 40x80x15 DT Container shelter Single truss...

Page 2: ...p tensioning device 16 6 Clips 32 7A Left base plate 11 7B Right base plate 11 8 Ratchet 22 9 Nylon band for ratchet 22 10 Tensioning tube 2 groups 11 Bolts M8x70 176 0 Bolts M12x30 132 12 Bolts M10x8...

Page 3: ...y to take off snow immediately otherwise it will slide off on its own READ ALL INSTRUCTIONS BEFORE ASSEMBLY 1 Keep the work area clean Accidents are more likely in cluttered areas Do not set up near s...

Page 4: ...LATION PROCESS A BASE PLATES INSTALLATION Please refer to the Figure 1 to place the base plates Figure 1 1 The measure must be taken from center to center of the base plates Refer to the diagram above...

Page 5: ...e Top Bent Tube part code 1 the Side Bent Tube part code 2 and the Lower Bent Tube part code 3 with the Bolts M8x70 part code 11 these make one group of arches Please NOTE the direction of the bolt DO...

Page 6: ...rches connect the Purlin part code 4 onto them using the Bolts M10x80 part code 12 There are 7 pieces of Purlins part code 4 between each arch 4 Install the Inclined Top tension device part code 5 usi...

Page 7: ...e pull the cover up over the arches with the breeze blowing in the cover like a sail filled with air 1 Insert the Tensioning tube part code 10 into the pockets on the end of the roof cover part code 1...

Page 8: ...e Nylon band for ratchet part code 9 to tie down the Tensioning tubes Figure 8 4 Weld the Angle seats part code 16 on each container and use Knitting Rope for Cover part code 14 to knit the cover on t...

Page 9: ...HED UNDER ANYCIRCUMSTANCES until the final assembly and tightening has been completed The process is quite easy but some tightening adjustments will be necessary to get a flat tensioned roof cover Ple...

Reviews: