5
B - FRAME INSTALLATION (Refer to figure 2 for the full diagram)
Figure 2
1.
Connect the
Roof Bent Tube
(part code 1), the
Upside Bent Tube
(part code 2), the
Underside Bent Tube
(part code 3) and the
Lower Bent Tube
(part code 4) with the
Bolt M10x100
(part code 9); these make one group of arches. Please NOTE the
direction of the bolt.
DO NOT
install the bolts on the top of the truss where the
fabric will rest.
2.
Insert one end of the assembled arch into one base plate and force the other end
of the arch into the opposite base plate.
Figure 3