STEP 7
You will need box -
SA-HART
TOP
screw in to
this point
CB1
Screw CB1 Bolts into all
the holes marked with
a red circle
Remove the SA-HART-TOP from the box and fit the CB1 bolts as shown below
SA-2BT
SA-HART-TOP
Once you have screwed the bolts into the panel place it carefully to one side.