STEP 12
You will require SA-HART-TCD from box SA-HART-TCBB&SH you have already opened. Fit the top
centre divider as shown below using connectiing locks and the bolts you have already fitted to the main
shelf.
SA-LYD-M
RHS
SA-LYD-
M
LHS
BACK EDGE
Page 1: ...Hartland Allstore store away Assembly Instructions revised 0520 1 0...
Page 2: ...Please be careful during construction as section of the cupboard may be unstable until construction is complete Your hardware pack should contain the following CONNECTING BOLT CB1 X 32 CONNECTING LOC...
Page 3: ...o this point CB1 Screw CB1 Bolts into all the holes marked with a red circle Screw CB2 Bolts into all the holes marked with a red circle Insert CL1 Locks into the holes as indicated Attach hinges usin...
Page 4: ...s as indicated SA 2BT STEP 4 You will need to open box Insert CL1 Locks into the holes in the SA HART MB1 and SA HART MB2 panels from this box BACK EDGE STEP 3 Insert CL1 Locks into the holes in the S...
Page 5: ...e Secure by turning all of the connecting locks in the backs and the base approx one half turn Then screw the remaining 35 17D screws into the angle brackets to secure the side to the base SA HART LHS...
Page 6: ...RT RHS onto the top and secure all the connecting locks and angle brackets Then carefully stand the unit onto its wheels IT IS HIGHLY RECOMMENDED TO HAVE TWO PEOPLE TO COMPLETE THIS STEP TO AVOID INJU...
Page 7: ...to this point CB1 Screw CB1 Bolts into all the holes marked with a red circle Remove the SA HART TOP from the box and t the CB1 bolts as shown below SA 2BT SA HART TOP Once you have screwed the bolts...
Page 8: ...SA LYD M RHS STEP 8 SA LYD M LHS BACK EDGE screw in to this point CB1 Screw CB1 Bolts into all the holes marked with a red circle...
Page 9: ...A LYD M LHS BACK EDGE Fit the bottom centre dividers as shown below using connectiing locks and the bolts you have already tted to the base SA HART BCD SH STEP 9 You will need to open box From this bo...
Page 10: ...require SA HART MSH from box SA HART TCBB SH you have already opened Fit the connecting bolts as shown below screw in to this point CB1 Screw CB1 Bolts into all the holes marked with a red circle OTH...
Page 11: ...STEP 11 Fit the main shelf and tighten all of the connecting locks including those pre tted into the underside of the desk shelf SA LYD M RHS SA LYD M LHS BACK EDGE...
Page 12: ...ire SA HART TCD from box SA HART TCBB SH you have already opened Fit the top centre divider as shown below using connectiing locks and the bolts you have already tted to the main shelf SA LYD M RHS SA...
Page 13: ...STEP 13 Fit the SA HART TOP to the unit by tightening all of the connecting locks SA LYD M RHS SA LYD M LHS BACK EDGE...
Page 14: ...ding the hinge part which is pre attached to the door on to the hinge which you have fixed to the side Then tighten the screw in the centre to secure You may find that you need to loosen the screws in...
Page 15: ...pegs SP1 and a shelf above then continue until the section is full Use shelves as indicated below and SP1 shelf pegs as supplied The setup of shelves and boxes shown here is only one option the shelv...
Page 16: ...Hartland Allstore store away The Storeaway Hartland Allstore unit is designed and manufactured in the UK by C R A F T S storage www storage4crafts co uk...