B. If installing the unit at the pad level, align and set
the Base Plate directly on the footing, ensuring it is
plumb and level. See Figure 7.
C. Install the lower sidewalls (2), ensuring they are
level and square. Plan for the location of the gas line
for the vent free log set, as you will typically want to
locate it in the lower sidewall, approximately 4” from
the bottom, on the right side wall. Drill a hole large
enough to accommodate the gas line, using a drill
masonry bit. See Figure 8.
D. Install the middle sidewalls (2), ensuring they are
level and square. See Figure 9.
E. Install the back plate (3). See Figure 10.
F. Install upper sidewalls (4L) and (4R), ensuring
the correct piece is placed in position. The correct
position is when the inner wall, outer wall and front
are parallel with the middle wall pieces. Place each
so the front is set back 3½ inches from the front of
the middle wall piece below. See Figures 11 & 12.
Figure 7. Base Plate on Pad
2
2
3
Figure 8. Lower Sidewalls
Figure 9. Middle Sidewalls
Figure 10. Back Plate
Figure 11. Upper Sidewalls
5R
4L
4R
4L
4R
Figure 12. Upper Sidewalls –Top View
2
2
1
Base Plate
Concrete Pad