5
2.4 INSTALLING PERMANENT WIRING
If permanent wiring is required by local codes, the follow-
ing procedure must be performed.
WARNING
Disconnect freezer from the source of electrical
supply before servicing.
A.
Remove the left side panel and electrical box
cover.
B.
Disconnect the wires from the terminal block.
Disconnect the green ground wire from the
grounding stud. (Fig 2-5).
C.
Remove the power cord.
D.
Install permanent wiring according to local code.
E.
Replace the electrical box cover and left side
panel.
Figure 2-5 Power Cord Connections
Summary of Contents for SO212
Page 1: ...Model SO212 OPERATORS MANUAL Manual No 513610 Rev 2...
Page 2: ......
Page 12: ...6...
Page 22: ...16...
Page 28: ...22...