Mounting instructions for springrider „papilio3“ 

Item No. 51 3016 401

State: 29.05.2020 p. 2

Play level

Foundation anchor

Concrete foundation

1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 3). 

2.  The impact area of a playground equipment with an enforced movement is 

not allowed to overlap the impact area of other equipment. 

According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made 

on the entire impact area of every equipment that cause forced movement.

3.  Carry out excavation work for the foundation as shown in diagram 2. After 

excavation compress the foundation floor.

 

Note: 

The springrider is installed at play level. 

4.  Set up the concrete foundation according to diagram 2 with central, horizon-

tal reinforcement. Pour the supplied foundation anchor in the foundation so 

that the upper angle frame is horizontal and flush with the foundation surface.

5.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with excavation.

Reinforcement plan: 

Concrete foundation with reinforcement

Main foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C20/25

1000

526

481

931

500

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

Papilio 3

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:15

A3

Name

Name

Fundamentplan

0107-00-00

Maßstab

Mattheis

15.07.16

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
SI

15.05.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

Diagram 2: Foundation plan

1000

526

481

931

500

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

Papilio 3

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:15

A3

Name

Name

Fundamentplan

0107-00-00

Maßstab

Mattheis

15.07.16

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
SI

15.05.20

stoßdämpfender Boden

A

Datum

Änderung

Rev