background image

State: 26.08.2021 p.  1

Mounting instructions for multiplay „gravis 4B“

Item-No.  51 5519 442

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved

climbing eye

platform

climbing balls

layaway bow

slide

wobble bridge

climbing wall

climbing net

sliding bow

Diagram 1: Overall view of the play equipment

post

parallel bars slide

Summary of Contents for Multiplay gravis 4B

Page 1: ...mbH Gewerbegebiet Larsheck D 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved climbing eye platform climbing balls layaway bow slide wobble bridge climbing wall...

Page 2: ...After a setting period of 10 14 days depending on weather conditions and foundation size fill up and compress the holes between the foundation and the foundation hole with excavation Diagram 2 Top vi...

Page 3: ...040 2778 1958 1523 635 635 5273 2332 2905 1985 1513 17012 15531 6 0 740 740 1559 1559 7 7 1 5 5 0 3 1 2 6 4 4 6 9 7 1 3084 2164 3044 3032 2 6 4 4 5 8 3 4 7 9 9 6 7 6 1 4 7 0 0 3 7 1 1 5 6 7 9 4 3 0 5...

Page 4: ...ery 11 Connect the slide diagram 5g with the tower at the intended locations acc to diagram 6c Please fasten the parts using the screws including in the deli very 12 Connect the climbing balls diagram...

Page 5: ...193650 2 x BENENNUNG DATUM NAME WERKSTOFF Diagram 5g Attachment part slide Diagram 5h Attachment part parallel bars slide Diagram 5d Attachment part climbing balls Diagram 5a Attachment part climbing...

Page 6: ...t Larsheck D 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved pipe adapter Diagram 6c Attachment for slide Diagram 6a Attachment for layaway bow climbing balls...

Page 7: ...in combination with moisture brown rust stains If such corrosion occur on stainless steel parts they are fine to remove with an abrasive 240 grit Please take care when transporting and setting up the...

Reviews: