background image

©  stilum GmbH, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved

State: 03.11.2016 p.  4

Mounting instructions for multiplay equipment „gravis 1B“

Item-No. 51 5519 402

scope of supply and attachment of spare parts

Diagram 4a: Spare part „Plattform“

Anbindung Hangelbogen

Anbindung Kletternetz

Anbindung

Kletterbogen

Anbindung Gestell

Rev.:

Projekt:

BESTELL-NR:

ZG-NR:

BENENNUNG:

OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT 

NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET 

WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

FREIG:

GEPR:

GEZ:

DATUM:

NAME:

WERKSTOFF



MAßSTAB:

OBERFLAECHEN NACH

DIN ISO 1302 REIHE 2

ZUL. ABWEICHUNG

DIN 2768 - mH

+0,3

-0,3

WERKSTUECKKANTEN

NACH DIN 6784

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

A3

04.12.2014

Abmaße:

Fertigung:

x

1x

Gewicht:

Anbindung Turm

Rev.:

Projekt:

BESTELL-NR:

ZG-NR:

BENENNUNG:

OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT 

NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET 

WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

FREIG:

GEPR:

GEZ:

DATUM:

NAME:

WERKSTOFF



MAßSTAB:

OBERFLAECHEN NACH

DIN ISO 1302 REIHE 2

ZUL. ABWEICHUNG

DIN 2768 - mH

+0,3

-0,3

WERKSTUECKKANTEN

NACH DIN 6784

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

A3

0133-01-00

29.04.2015

Abmaße:

Fertigung:

x

x

Gewicht:

35723.4

Gravis2

Diagram 4b: frame

connection tower

connection frame

5.  Connect the platforms as described in diagram 1, 4a and 4b at the indicated 

positions with the frame. Please fasten the parts using the screws (cap nut 
M12) including in the delivery.

6.  The base frames of the towers ave to be positioned on the foundations as 

shoen in diagram 1 and 2b.  

Note: Do not screw the base plates onto the foundations yet!

       

                        

7.  Connect the slide (diagram 5b) with the tower at the intended locations and 

fasten it with the screws included.        

8. 

Connect the climbing arc with the adapter and screw as shown on fiagram 5 

(screws included in delivery).

9.  Connect the climbing net (diagram 5a) with the tower at the intended loca-

tions acc. to the Diagram 1 and 5 and place the flat steel on top of the found

-

ation. Please fasten the parts using the screws including in the delivery.

10. Align the play equipment more on the foundations.  

Note:

 The climbing net should be placed with tension.

11.  Drill holes into all foundations and screw the play equipment into the founda-

tions with the included heavy-duty dowels.

12. Seal the foundation with the safety cover required for the height of fall  

indicated.  

Critical drop height: 1500 mm.    

 

 

 

 

 

Recommended surface material: sand, wood chip, gravel, synth. fall protec-
tion. 

13. Do not allow children to use the equipment before the installation has been 

finished.

14. After 3 months, check the screws at the joints and retighten them if  

necessary.

Reviews: