Mounting instructions for multiplay equipment „gravis 1B“
Item-No. 51 5519 402
scope of supply and attachment of spare parts
Diagram 4a: Spare part „Plattform“
Anbindung Hangelbogen
Anbindung Kletternetz
Anbindung
Kletterbogen
Anbindung Gestell
Rev.:
Projekt:
BESTELL-NR:
ZG-NR:
BENENNUNG:
OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT
NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET
WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
FREIG:
GEPR:
GEZ:
DATUM:
NAME:
WERKSTOFF
MAßSTAB:
OBERFLAECHEN NACH
DIN ISO 1302 REIHE 2
ZUL. ABWEICHUNG
DIN 2768 - mH
+0,3
-0,3
WERKSTUECKKANTEN
NACH DIN 6784
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
A3
04.12.2014
Abmaße:
Fertigung:
x
1x
Gewicht:
Anbindung Turm
Rev.:
Projekt:
BESTELL-NR:
ZG-NR:
BENENNUNG:
OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT
NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET
WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
FREIG:
GEPR:
GEZ:
DATUM:
NAME:
WERKSTOFF
MAßSTAB:
OBERFLAECHEN NACH
DIN ISO 1302 REIHE 2
ZUL. ABWEICHUNG
DIN 2768 - mH
+0,3
-0,3
WERKSTUECKKANTEN
NACH DIN 6784
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
A3
0133-01-00
29.04.2015
Abmaße:
Fertigung:
x
x
Gewicht:
35723.4
Gravis2
Diagram 4b: frame
connection tower
connection frame
5. Connect the platforms as described in diagram 1, 4a and 4b at the indicated
positions with the frame. Please fasten the parts using the screws (cap nut
M12) including in the delivery.
6. The base frames of the towers ave to be positioned on the foundations as
shoen in diagram 1 and 2b.
Note: Do not screw the base plates onto the foundations yet!
7. Connect the slide (diagram 5b) with the tower at the intended locations and
fasten it with the screws included.
8.
Connect the climbing arc with the adapter and screw as shown on fiagram 5
(screws included in delivery).
9. Connect the climbing net (diagram 5a) with the tower at the intended loca-
tions acc. to the Diagram 1 and 5 and place the flat steel on top of the found
-
ation. Please fasten the parts using the screws including in the delivery.
10. Align the play equipment more on the foundations.
Note:
The climbing net should be placed with tension.
11. Drill holes into all foundations and screw the play equipment into the founda-
tions with the included heavy-duty dowels.
12. Seal the foundation with the safety cover required for the height of fall
indicated.
Critical drop height: 1500 mm.
Recommended surface material: sand, wood chip, gravel, synth. fall protec-
tion.
13. Do not allow children to use the equipment before the installation has been
finished.
14. After 3 months, check the screws at the joints and retighten them if
necessary.