background image

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

Mounting instructions for playpoint without impact protection  

„flova cala“

Item No. 51 3410 401

State: 28.05.2020 p. 2

 

1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 3: Ø 3500 mm). 

2.  Carry out excavation work for the foundation as shown in diagram 2. After 

excavation, compress the foundation floor.

 

Note: 

The playpoint is installed at play level. 

3.  Set up the concrete foundation according to diagram 2 with central, horizontal 

reinforcement. Pour the supplied foundation anchor in the foundation so that 

the upper angle frame is horizontal and flush with the foundation surface.

4.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with the excavation.

5.  Clean the surface of the foundation. Place the play equipment on the founda-

tion anchor and screw it down. Create topsoil. 
Recommended surface material: optional, with the exception of sand 

Note: 

The ground should be smooth and free of edges. 

6. 

Do not allow children to use the equipment before the installation has been 
finished.  

 

Reinforcement plan: 

Concrete foundation with reinforcement

Main foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C20/25

Diagram 2: Foundation plan

Play level

Foundation anchor

Concrete foundation

500

500

350

850

1800

 153 

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

flova cala

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:15

A3

Name

Name

Fundamentplan

1501-00-00

Maßstab

Behnke

16.11.2016

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete
gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
SI

06.05.20

beliebiger Boden

A

Datum

Änderung

Rev

beliebiger Boden

optional floor

Reviews: