Heavy duty floor can be installed on unlevelled ground
–
use supplied logs to level your floor by digging them
into the ground- see support positions in pic above
–
attach logs to floor using 4 x 100BS per support.
Ensure floor frame is square by measuring from corner to corner diagonally prior to installing flooring
STEP 1.1
FLOORING INSTALLATION
1.1
–
FLOOR INSTALLATION
PART CODE
QTY DESCRIPTION
FB
4
Floor Board 1798x800mm
FB
4
Floor Board 598x800mm
FB
1
Floor Board 1798x311mm
FB
1
Floor Board 598x311mm
50PS
100 50mm Philips Screw
1.1
–
FLOOR SHEETS
Fasten floor sheets to floor frame as shown below using 50PS, screw edges and centre of
sheets into every joist