34 |
P a g e
STEP 5.2
DOOR HANDLE ASSEMBLY
5.2 - ASSEMBLY PARTS
–
DOOR HANDLE ASSEMBLY
PART CODE QTY
DESCRIPTION
TH
1
T Handle
5.2 - ASSEMBLY
–
DOOR HANDLE ASSEMBLY
Remove bolts and leaver from back of T Handle (TH). Mark and drill 12mm centre hole in
position shown, 50mm in from door edge.
Insert T handle in position and mark two outside holes. Remove T handle and drill 2 x 6mm
holes.
Insert T handle back in with bolts, and fasten nuts on back of door.
STEP 5.3
DOOR HANDLE ASSEMBLY
5.3 - ASSEMBLY PARTS
–
DOOR HANDLE ASSEMBLY
PART CODE QTY
DESCRIPTION
1
T Handle Leaver
5.3 - ASSEMBLY
–
DOOR HANDLE ASSEMBLY
Holding door in closed position, flush with VJ cladding on front - slide leaver onto T Handle
and tighten once hitting on wall stud beside door.
Summary of Contents for S3041
Page 48: ...47 P a g e ...
Page 51: ...50 P a g e IMAGES TO HELP WITH INSTALLATION FLOOR ...
Page 52: ...51 P a g e ...
Page 53: ...52 P a g e ...
Page 54: ...53 P a g e ...
Page 55: ...54 P a g e ...
Page 56: ...55 P a g e ...
Page 57: ...56 P a g e ...
Page 59: ...58 P a g e ...