6 |
P a g e
STEP 2.0
WALL ASSEMBLY
2.0 - ASSEMBLY PARTS
–
WALL ASSEMBLY
PART CODE QTY
DESCRIPTION
FP
1
Front panel
12P
1
1200mm Wall panel
65HHS
3
65mm Hex head screw
If optional window was purchased, it can take the place of any 1200mm (12P) panel.
2.0
- ASSEMBLY
–
WALL ASSEMBLY
Screw through FP into 12P (top, centre & bottom) using 3 x 65HHS. (Holding studs flush on
the
outside
)
Note: Ensure tongue on VJ cladding is facing upwards.
12P
Screw 3 x 65HHS (Top,
centre & bottom)
FP
Cedar Strip
When screwing the four corners together please make sure the studs are flush on the
outside (not the inside) as per image below.
Summary of Contents for S3005
Page 36: ...35 P a g e IMAGES TO HELP WITH INSTALLATION FLOOR ...
Page 37: ...36 P a g e ...
Page 38: ...37 P a g e ...
Page 39: ...38 P a g e ...
Page 40: ...39 P a g e ...
Page 41: ...40 P a g e ...
Page 43: ...42 P a g e ...