![STILLA Maple Assembly Instructions Manual Download Page 5](http://html.mh-extra.com/html/stilla/maple/maple_assembly-instructions-manual_1380057005.webp)
4 |
P a g e
If no floor option was purchased, go to step 2.0 (Wall Assembly)
STEP 1.0
FLOOR KIT
1.0
–
FLOOR KIT
PART CODE QTY
DESCRIPTION
EP
4
End Plate 1870mm
SJ
6
Single Joist 1730mm
DJ
4
Double Joist 1730mm (42x35mm part of DJ goes at the top inside)
100BS
48
100mm Batten screw (Heavy Duty Floor Only)
75N
48
75mm Nail (Rebated Floor Only)
65HHS
6
65mm Hex head screw
1.0
–
FLOOR FRAME
Fasten through EP into DJ using 3 x 100BS per join (75N on Rebated Floor)
Fasten through EP into SJ using 2 x 100BS per join (75N on Rebated Floor)
Once first floor in position and logs are in place butt second floor in to mark the hole
positions
–
when ready using 6
–
65HHS screw through EP into EP holding flush on top.
HEAVY DUTY FLOOR KIT
Heavy duty floor can be installed on unlevelled ground
–
use supplied logs to level your floor
by digging them into the ground.
Install heavy duty floor kit using (L) 4 logs
–
1 in each corner (position shown above) screw
through frame into log using 4 x 100BS per corner
Yellow Tongue
DJ
DJ
SJ
SJ
SJ