37 |
P a g e
STEP 6.2
FASCIA ASSEMBLY
6.2 - ASSEMBLY PARTS
–
FASCIA ASSEMBLY
PART CODE QTY
DESCRIPTION
F
4
Fascia
40N
12
40mm Nail
6.2 - ASSEMBLY
–
FASCIA ASSEMBLY
Hold fascia’s in position. Flush with bottom of battens and joining evenly at the top.
STEP 6.3
RIDGE CAP INSTALLATION
6.3 - ASSEMBLY PARTS
–
RIDGE CAP INSTALLATION
PART CODE QTY
DESCRIPTION
RC
3
1520mm Ridge Cap
40RS
8
40mm Roof screw
6.3 - ASSEMBLY
–
RIDGE CAP INSTALLATION
Slide ridge cap into position. Make sure peak of ridge cap is in line with peak of
fascia’s
.
Screw through ridge cap into 2
nd
rib in from end and through into batten.
Slide second and third ridge cap into position and fasten at opposite end. Ensure ridge cap is
straight and fasten through the centre overlaps, both sides.
Summary of Contents for Bromley
Page 44: ...43 P a g e ...
Page 47: ...46 P a g e IMAGES TO HELP WITH INSTALLATION FLOOR ...
Page 48: ...47 P a g e ...
Page 49: ...48 P a g e ...
Page 50: ...49 P a g e ...
Page 51: ...50 P a g e ...
Page 52: ...51 P a g e ...
Page 53: ...52 P a g e ...
Page 54: ...53 P a g e ...