InStallatIOn
commissioning
26
�0
2�
10
�0
19
3
1
2
3
4
1 Butterfly valve with adjusting screw
2 MEK
3 MED
4 MEB
f
f
Fit the following onto the tap body:
- MEK: Pivoting spout
- MED: Shower hose with retainer for hand shower
- MEB: Pivoting arm with shower hose and retainer for hand
shower
7. commissioning
f
f
Thoroughly flush the cold water supply line.
f
f
Filling the water heater: Open the DHW valve by pulling the
lever forwards and moving it sideways.
f
f
Wait until water flows from the outlet, then switch on the
water heater.
7.1 checking the maximum flow rate
!
Material damage
With non-pressurised water heaters, observe the max-
imum permissible flow rate when the tap is fully open
(see chapter "Specification / Data table").
f
f
If the flow rate exceeds the stated value when the
tap is fully open, reduce the flow via the butterfly
valve in the wall connection.
f
f
For this, remove the cap and turn the adjusting
screw clockwise with a screwdriver.
7.2 specification
7.3 dimensions and connections
meK
G 1/2
190
100
G 1/2
200
70
337
100(70)
D
00000
17
71
6
299485_MEK_MED_MEB_de_en_fr_nl_pl.indb 13
27.02.2013 13:53:49