
INSTALLATIoN
Commissioning
20 |
WST-W | TWS 2 | AHu 50
7. Commissioning
f
f
Thoroughly flush the cold water supply line.
f
f
Fill the water heater. Adjust the tap head to the maximum
temperature (turn fully anti-clockwise) and open the draw-
off valve.
f
f
Wait until water flows out. Then switch on the water heater.
7.1 Checking the maximum flow rate
!
Material losses
Observe the maximum permissible flow rate with a fully
opened draw-off valve (see chapter "Specification / Data
table") when using non-pressurised water heaters.
f
f
If the flow rate exceeds the stated value when the
tap is fully open, reduce the flow rate using the
restrictor provided; see chapter "Specification / Di-
mensions and connections".
8. Specification
8.1 Dimensions and connections
WST-W
126
215
147
Ø33
500
360
D
00000
72
32
4
1
2
3
4