Assembly
Operation & maintenance instructions (Version H)
37
SKY-200/250
4
The shims, anchors and bolts can be ordered as an option (art. No. 41300990).
4.5
Assembling main parts
Follow the next described procedure for the assembling of the main parts of the
vehicle lift.
The SKY-200/250 is delivered in three main parts:
• two pre-assembled tracks,
• control console.
First position the lift and as second the control box. In case of protection pipes in the
foundation, position the lift relative to the position of the control box.
The control box can be placed to the left side or to the right side, to the front or to the
rear, according to the requirements of the user or local conditions.
With the on the floor mounted versions, cable channels are included within the
delivery. These cable channels can be used as stated in
position of the cable chain (1).
Figure 4.6
Adjustment of height differences
Shims
Summary of Contents for SKY-200
Page 152: ...Operation maintenance instructions Version H 152 SKY 200 250 ...
Page 153: ......