6
7
INsTallaTIoN
INsTallaTIoN
EXTrEmE cs DPE/DP b
SteP 2 – CoNNeCtING tHe wAter SUPPLy
∙ remove the plastic tip that is inserted in the end
of the black flexible tube.
∙ Connect the dual power box to the water supply
lines.
∙ Connect the black flexible tube to the quick
connector on the top of the dual power box.
∙ Place battery into the Dual Power input box.
SteP 3 – CoNNeCtING tHe Power SoUrCe
1
Turn on the central water supply. Check for leaks.
Remove the protective sticker from the sensor.
2
Connect the power source.
3
Once the power source is connected,
wait 15 seconds to allow the system
to set the ideal sensor range. A LED
will flash continously to indicate this
adjustment period. The solenoid valve
will open for 1 second to indicate that
the ideal sensor range was set.
15
SECONDS
2
If the automatically adjusted sensor range is not satisfactory to your purposes,
please refer to the section entitled “Settings adjustment”.
SteP 1 – INStALLING tHe FAUCet
1
shut off the water supply.
2
Cut an adequate sized hole in the wall for the dimensions of the faucet
base (see Technical Data).
3
Install the faucet base firmly to the
roughing wall.
4
Attach the temporary protective cover
over the faucet base.
NoTE
: Make sure that the corrugated tube outlet remains outside of the wall
during tiling. Access is needed after the completion fo the wall.
5
Once the electrical, plumbing and tile work is complete cut off the
temporary faucet base cover. Then slide the rosette on the base of the
faucet.
6
Pass the four pin connector and the black flexible tube (connected to the
faucet head) through the base of the faucet until they can be accessed
from the opposite side of the corrugated green tube.
7
Place the faucet on the base and secure it with the set screw on the bottom.
Summary of Contents for Extreme CS B