2
AVENGERS INFINITY QUEST LE / PREMIUM MANUAL 500-55R2-01
© MARVEL
TABLE OF CONTENTS
1. Setup and Moving .................................. 3
1.1 First-Time Setup Instructions ...............................
3
1.2 Adjustments Menu ............................................... 6
1.3 Transporting the Game ........................................
7
1.4 Maintenance ........................................................
8
1.5 Maintenance Kits .................................................
8
1.6 Common Parts .....................................................
8
2. SPIKE System and Node Guide ............ 9
2.1 SPIKE System Overview ......................................
9
2.2 Node Bus Cabling ................................................
9
2.3 System Power ......................................................
9
2.4 SPIKE Node Addresses .......................................
9
2.5 SPIKE Node Programming................................. 10
2.6 SPIKE System Terminology ............................... 10
2.7 Common SPIKE Node Boards ........................... 10
3. Light, Switch, and Driver Reference ... 11
3.1 SPIKE Node Boards ........................................... 11
3.2 Driver Reference ................................................ 12
3.3 Switch Reference ............................................... 14
3.4 Light Reference .................................................. 18
4. Electronic Pinouts and Schematics.... 24
4.1 SPIKE-2 CPU Node 0 ........................................ 24
4.2 Cabinet Node 1 ..................................................
28
4.3 Lower Playfield 48V Driver Pinout Node 8 .........
29
4.4 Mid Upper Playfield 48V Driver Pinout Node 9 .. 30
4.5 Lower Center LED Board 8b .............................. 31
4.6 Magnetic Angle Sensor Board 8c ...................... 31
4.7 Magnetic Sensor Dual Board ............................. 31
4.8 Lower Left LED Board 8d...................................
32
4.9 Mid Center LED Board 8d1 ................................
32
4.10 Top Center LED Board 9a ..................................
33
4.11 Top Left LED Board 9a1 ..................................... 34
4.12 Top Right LED Board 9a2 .................................. 34
4.13 Mid Left LED Board 9b ...................................... 34
4.14 Top Left LED Board 9b1 ..................................... 35
4.15 Gauntlet LED Board ........................................... 35
4.16 Star Rollover Board ............................................ 35
4.17 Opto 3-Ball Lock Receiver ................................. 35
4.18 Opto 3-Ball Lock Emitter ................................... 35
4.19 Trough Serial Opto Receiver 8a ......................... 36
4.20 Trough Serial Opto Transmitter .......................... 36
4.21 Main Power Supply ............................................ 36
4.22 Power Distribution Board ...................................
37
4.23 Power Plug Wiring..............................................
37
5. Parts Reference .................................... 38
5.1 Playfield Rubber Parts .......................................
38
5.2 Rubber Size Chart ..............................................
38
5.3 Playfield Assemblies, Top ..................................
39
5.4 Playfield Assemblies, Bottom ............................ 40
5.5 Backbox Parts.................................................... 41
5.6 Speaker Panel Parts .......................................... 41
5.7 Cabinet Parts ..................................................... 42
5.8 Ball Shooter Assembly ....................................... 43
5.9 Auto Launch Assembly ...................................... 43
5.10 Ball Trough Assembly......................................... 44
5.11 Slingshot Assembly............................................ 44
5.12 Flipper Assembly, Left ........................................ 45
5.13 Flipper Assembly, Right ..................................... 45
5.14 Pop Bumper Assembly ...................................... 46
5.15 3-Bank Drop Target Assembly ........................... 47
5.16 Bottom Arch Front Lighting Assembly ............... 48
5.17 Side Mount Spinner Assembly ........................... 48
5.18 Inner Loop Opto Assembly ................................ 48
5.19 One Way Gate Assembly ................................... 48
5.20 Ball Guide 03 Assembly ..................................... 49
5.21 Ball Guide 06 Assembly ..................................... 49
5.22 Plastic 05 Assembly ........................................... 50
5.23 Plastic 07 Assembly ........................................... 50
5.24 Plastic 12 Assembly ........................................... 51
5.25 Plastic 15 Assembly ........................................... 51
5.26 Plastic 16 Assembly ........................................... 51
5.27 Plastic 18 Assembly ........................................... 52
5.28 Plastic 19 Assembly ........................................... 52
5.29 Plastic 52 Assembly ........................................... 53
5.30 Plastic 72 Assembly ........................................... 53
5.31 Disc Scoop Assembly ........................................ 54
5.32 Disc Scoop Crank Assembly ............................. 54
5.33 Disc Scoop Spinner Assembly........................... 54
5.34 Disc Scoop Shaft Assembly .............................. 55
5.35 Disc Scoop Lift Fork Assembly .......................... 55
5.36 Left Ramp Assembly .......................................... 56
5.37 Center Ramp Assembly ..................................... 56
5.38 Right Ramp Assembly ....................................... 57
5.39 Right Wire Ramp Assembly ............................... 57
5.40 Subway Decal Assembly ................................... 58
5.41 Subway Entrance Opto Assembly ..................... 58
5.42 Subway VUK Assembly ..................................... 58
5.43 Walking Lock Assembly ..................................... 59
5.44 Walking Lock Top Assembly .............................. 59
5.45 Walking Lock Bottom Assembly ........................ 60
5.46 VUK Funnel Assembly........................................ 60
5.47 Spring Gate Assembly ....................................... 60
5.48 Up Post Assembly ............................................. 61
5.49 Gauntlet Assembly ............................................. 61
5.50 Backpanel Assembly.......................................... 61
6. Specifications ....................................... 62
6.1 Game Dimensions .............................................. 62
6.2 Warranty ............................................................. 63
6.3 Warnings, Compliance, and Legal Notices ........ 63