![Stern Engineering EVER Installation And Maintenance Manual Download Page 7](http://html.mh-extra.com/html/stern-engineering/ever/ever_installation-and-maintenance-manual_1375298007.webp)
10
11
INSTALLATION
STEP 1 –INSTALL THE WALL UNIT - TUBULAR HD
1
Drill a 29-33 mm hole in the wall at the
desired location.
29-33 mm
2
Insert the base through the hole and fas-
ten the nut and metal ring onto the base
of the HD to hold it firmly in place.
Attach hose to base using the hose
clamp (supplied).
Continue with STEP 2: INSTALLING THE MOTOR (pages 10-11)
STEP 1 –INSTALL THE ROUGH IN PART - TUBULAR HD DP
In the brick or concrete wall, a hole must be carved into the wall to make space for the
wall mount and air duct. The body must be removed from the base by opening the set
screw at the base of the body.
1
Cut an adequate opening in the wall
according to the dimensions of the
Tubular DP HD, the cables sleeve and
the hose.
2
Drill 4 small holes for the tubular base
support and drive the anchors in.
3
Secure the base support using the
4 screws. make sure that the base is
leveled to the center.
After tiling mount the Tubular body onto
the base and thread the cable through
the base and air hose.
Continue with STEP 2: INSTALLING THE MOTOR (pages 10-11)
INSTALLATION
STEP 1 –INSTALL THE DECK UNIT - EVER HD
Recommended hole size
33-36mm
1
Remove the hexagonal nut, the disk and
the gasket. Do not remove the O-ring
from the base of the HD.
NUT
DISC
GASKET
O-RING
2
Place the HD with O-ring into the hole in
deck or lavatory. Make sure the O-ring
is located between the deck or lavatory
and the bottom of the HD.
O-RING
3
Slide the gasket, disk and hexagonal nut
over the flexible hose and secure the HD
into place.
NUT
DISC
GASKET
O-RING
STEP 2 – CONNECTING OPEN WIRE - ALL MODELS
6
Position unit at the end of the air hose.
Connect the unit firmly to the wall.
Note: Hose length can not be cut.
Note: make sure the bottom of the unit
has a clearing of a minimum 10 cm (4”)
from any obsticle.
Connect to
the wall
7
Attach the connector.