9
1. Set Time of Day:
Time of day should only need to be set after extended power outages or when daylight saving time begins or
ends. If an extended power outage occurs, the time of day will flash on and off indicating that the time should
be reset.
STEP 1 --
Press SET CLOCK
STEP 2 --
Current Time (hour): Set the hour of the day using
or
buttons. AM/PM toggles after
12. Press
next
to go to step 3.
STEP 3 --
Current Time (minutes): Set the minutes using
or
buttons. If it is desired to go back up
to the previous step press
regen
button once. Pressing
next
will exit Set Clock and return to
the general operating display.
2.
Programming:
NOTE:
The manufacturer has preset the unit so that the gallons between regenerations will be automatically
calculated after the hardness is entered.
STEP 1 --
Press
next
and
simultaneously for 3 seconds.
STEP 2 --
Hardness: Set the amount of hardness in grains per gallon (default 20) using the
or
buttons. The allowable range is from 1 to 150 in 1 grain increments.
Press
next
to go to step 3. Press
regen
if you want to exit.
STEP 3 --
Day Override: The manufacturer has factory set this at 3 days as the default. This is the
maximum number of days between regenerations. A regeneration initiation will be called
for on that day even if a sufficient number of gallons were not used to call for a
regeneration. Set the day override using
or
buttons (3 is recommended). Press
next
to go to step 4. Press
regen
if you need to return to the previous step.
Programming Procedures for the IFS
Summary of Contents for IFS10
Page 17: ...16 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 18: ...17 Component Parts Breakdown A B C D 3 1 2 4 5 6 4 5 7 8 9 10 11 12 13 ...
Page 20: ...19 Control Valve Breakdown ...
Page 25: ...24 Quick Reference Guide ...
Page 26: ...25 ...