CONTROL CABLE WIRING TEST
Tech Support:
consumer.steppir.com/support | 425.453.1910 | [email protected]
35
•
Once you have installed the control cables we recommend that you perform the following test to confirm that every-
thing is wired correctly. If something is wired incorrectly it could cause damage to the electronics in the antenna con-
troller.
•
Take the following measurements on the 25 pin Dsub field splice. Measure on the indicated pin pairs using a multi-
meter set to measure Ohms.
Pin Pair
Antenna Element
Expected Resistance
1-2
Driven
~ 20 Ohms
3-4
~ 20 Ohms
5-6
Director 1
~ 20 Ohms
7-8
~ 20 Ohms
9-10
Reflector
~ 20 Ohms
11-12
~ 20 Ohms
14-15
Director 2
~ 20 Ohms
16-17
~ 20 Ohms
18-19
Director 3
~ 20 Ohms
20-21
~ 20 Ohms
13-23
Relay 2
~ 140 or ~ 360 Ohms
13-24
Relay 3
~ 280 or ~ 720 Ohms
•
Your results may be slightly higher or lower but the readings for the elements should be consistent. If your results do
not match the results of the table below, check your wiring and/or contact SteppIR for assistance.