Function Switches - Vision 300/400
Vision 300 and 400 models are fitted with
4 switches mounted in a panel located next
to canister 1.
These switches (figure 5) are used for the
following functions.
1.
Flush Switch: When this switch is
pressed the machine will flush through
the complete water system.
The “sorry not in use self cleaning”
message is displayed, the blocker
enabled and the controller waits until
the water is at the correct
temperature set by the thermostat.
In order to guarantee the highest
standards of cleanliness, the boiler fill
valve is disabled ensuring that the
water used in the self-cleaning cycle is
delivered at the optimum temperature to kill any micro-organisms which may have
accumulated.
Each hot water valve is switched on in sequence for a pre-set flush time.While the
valves are on they are “rattled” to remove any limescale deposits and their
corresponding whippers are run.
Once the flush cycle is complete the controller refills the boiler to the correct
level. When the correct water temperature is reached the machine returns to
standby mode, ready to make a vend.
2.
Counters Switch:
When this switch is pressed the first drink counter is
displayed. The up and down arrows on the keypad enable the counters for each
drink to be viewed but not reset.
There is one vend counter for each drink, plus counters for jug vends, free vends,
total vends and total sales value.The total sales data is displayed in units of 1 penny.
3.
Reset Counters Switch: This switch enables the operator to reset the vend and
weight counters to zero.
Programming Manual
1
2
3
4
Figure 5
26
Summary of Contents for Viision 2000 Range
Page 2: ......
Page 33: ...Notes Programming Manual 31 ...
Page 34: ...Notes Programming Manual 32 ...
Page 35: ......