
Page 35 of 38
939502326 Rev G
®
ASSEMBLING A JUNCTION KIT TO A JUNCTION
VERTICAL POST
JUNCTION HARDWARE KIT
3
2
1
4
2b
1.
Configure brackets on vertical post to floor plan condition.
2.
Attach bottom block on first available slot above electrical
cutout. (It may be required to unassemble vertical post from
assembly junction - 2b)
3.
Stagger remaining block to position close to assembled
junction blocks. (Replace vertical post to assembled junction).
4.
Assemble vertical post to assembled junction.