
Page 2 of 38
939502326 Rev G
Tools
Table of Contents
2" WIDE
MASKING TAPE
PLUMB BOB
FRAMING LEVEL
CHALK LINE
w/ WHITE CHALK
RA
YB
O
Topic
Page
32-TOOTH BLADE
HACKSAW
Layout Drawings & General Information
Installing Ceiling Channels
Installing Ceiling Track
Where to start Installing Structure
Floor Guide
Vertical Post Assembly Features
Installing Full Height Vertical Post Assembly
Junction Assemblies
Floor Track Features & Installation
Structural Horizontal Installation
Intermediate Horizontal Installation
Partial Height Vertical Post Installation
Base Trim Installation
Base Trim Removal Process
Acoustic Block Installation
Assembling a Junction Kit to a Junction
Assembling a Mini End to a Junction
Changing Acoustic Seals
3-4
5-8
9-18
19
20
21-22
23
24-25
26
27
28
29
30-33
34
34
35
36
37-38
7/16” & 1/2”
PUTTY
KNIFE
BASE TRIM
INSTALLATION TOOL
T30
8mm & 10mm
8mm & 10mm
LARGE & SMALL
DEAD BLOW HAMMER
P2
POWER
ROTATE
FAST
SLOW
LASERTRANSIT
LASERTRANSIT
TIP: A 5-point alignment
self leveling laser is the
best tool to plumb, level
& square the product.
GLIDE
ADJUSTMENT
TOOL
HEAVY DUTY
UTILITY SHEAR