Steelcase Mackinac Assembly Instructions Manual Download Page 27

®

Page 2

7

 of 

71

 

1317809001

 Rev A

45

o

 or 1:30

CL

3:00

45

o

TURN 90

o

Removal of Plastic Lock Plug and 
Installation of Lock Cylinder

1

2

3

4

5

Summary of Contents for Mackinac

Page 1: ...ncy energy and if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encouraged to try to ...

Page 2: ... table attach cantilever 36 Collab table use set screws to level 37 Personal table lay P E T in position 38 Personal table attach cantilever 39 Personal table use set screws to level 40 Attach power box to cantilever 41 Collab table subtop to cantilever 42 Personal table subtop to cantilever 43 Perpendicular modesty panel bracket 44 Perpendicular modesty panel 45 Attach worksurface to cantilever 4...

Page 3: ...s for a double insulated product must be identical to the parts they replace A double insulated product is marked with the words DOUBLE INSULATION or DOUBLE INSULATED The symbol square within a square is also able to be marked on the product Improper connection of the equipment grounding conductor can result in a risk of electric shock Check with a qualified electrician or serviceman if you are in...

Page 4: ...ga carga siempre ponga los artículos más pesados abajo y no cerca de la parte superior para prevenir la posibilidad de que el mueble se vuelque 10 Para desconectar quite el enchufe del tomacorriente 11 No use esta mesa para poner los televisores sobre ella 12 Cada superficie destinada a soportar una carga tendrá una declaración correspondiente en las instrucciones de uso especificando la carga máx...

Page 5: ...71 1317809001 Rev A Locate Power Source Screw in Glides Until Stop If Drawers are Present Remove Them 1 4x 2 2x 1 IMPORTANT If installing Wall Hanging application reference pages 67 71 for installation steps 2x 2 ...

Page 6: ...ARNING Desk foundation must have correct counterweight package or be anchored to building Verify correct counterweight is installed when reconfiguring See Assembly Directions www steelcase com Desk Foundation Counterweight TIP HAZARD Top Plate Remove Top Plate to install counterweight ...

Page 7: ...7809001 Rev A Ganging Light Seal Installation If installing single low mass skip to pg 9 1 Determine Mounting Location 2x 2 NOTE If drawer is in end location where ganging use location b toward where drawer opens 2 a b ...

Page 8: ... Page 8 of 71 1317809001 Rev A For Multiple Foundations Attach 3 Ganging Brackets 4x 4x 4x 1 2a 2b Top Bracket Side Bracket Side Bracket 16x 2 ...

Page 9: ... Page 9 of 71 1317809001 Rev A Attach End Skins to Foundation 1 2 3 2x each skin 2x each skin 8x 2 ...

Page 10: ...ing Chart Worksurface Location RH Parallel or 36 wide LH Perpendicular LH Parallel or 36 wide RH Perpendicular Collab Centered Collab RH Biased 42 wide Collab LH Biased 42 wide 10 12 13 14 3 5 1 2 7 8 9 11 4 6 Bracket Location 1 2 3 4 5 6 7 8 9 10 11 12 13 14 ...

Page 11: ...2x 2 Page 11 of 71 1317809001 Rev A Install Lower Column Stabilizer Bracket 2x M8x14 2 1 NOTE Power cable will route under where Lower Column Stabilizer Brackets are SIDE VIEW ...

Page 12: ... Page 12 of 71 1317809001 Rev A Cable Routing Overview ...

Page 13: ... Page 13 of 71 1317809001 Rev A Place Unit in Desired Location Route Power Through Bottom of Foundation 1 2 NOTE If located against wall attach back skin to foundation reference page 23 ...

Page 14: ...cure power supply with strain relief bracket or zip tie NOTE Secure power supply with zip tie or drill 7 32 hole for strain relief no specific hole location necessary NOTE Check all wiring connections before securing power supply 2 NOTE 2 outlets will hang off bracket 5 16 ...

Page 15: ... Page 15 of 71 1317809001 Rev A Remove Column Lid and Lower Shroud 1 4 2 5 2x 3 2x M8x8 ...

Page 16: ...h Column 1 2 Zip Tie in Place 3 NOTE Plug cable into Power Adapter and Motor located in column base NOTE Adapter will rest on the cantilever when installation is finished NOTE If routing data do so at this point in the installation Power Unit 4 5 6 7 ...

Page 17: ... Page 17 of 71 1317809001 Rev A Route Power Cord Through Column and Carrier Pull Through Foundation and Up Next to Inlet Power Cord 1 2 Power Unit ...

Page 18: ... Page 18 of 71 1317809001 Rev A 1 Install Column Wire Cover ...

Page 19: ... 54 Foundation NOTE Reference Spec Guide for application rules Section Mackinac Guidelines 1154833001 rev A WARNING Desk foundation must have correct counterweight package or be anchored to building Verify correct counterweight is installed when reconfiguring See Assembly Directions www steelcase com Desk Foundation Counterweight TIP HAZARD Top Plate Remove Top Plate to install counterweight 2 3 T...

Page 20: ...hts Options Heavy Duty Counterweight Package Additional 14 counterweights behind column centered 29 total 1 4 Counterweights Counterweights Counterweights NOTE Do not apply counterweight cover on bay where column is to be installed for Heavy Duty 2 3 TOPVIEW ...

Page 21: ...re assembly direction before beginning installation Obtain assembly directions at Steelcase com Building construction varies greatly The SEOR Structural Engineer of Record is responsible for the design of building walls and floors which Mackinac products are attached to and must verify the adequacy of the mounting hardware even if provided by Steelcase The building owner or designated agent is res...

Page 22: ... Reinstall Counterweight Coverplates 18x 1 2 Page 22 of 71 1317809001 Rev A NOTE Do not apply counterweight cover on bay where column is to be installed for Heavy Duty ...

Page 23: ... Attach Remaining Outer Skin Page 23 of 71 1317809001 Rev A 1a NOTE Ensure the hooks engage completely in slots located on the lower mass 2 4 1b 3 10x 2 ...

Page 24: ... Install Touch Latch Page 24 of 71 1317809001 Rev A 1 2 3 NOTE Twist to calibrate TIP Exposed plunger head faces the front of drawer and ribs face inside of cabinet ...

Page 25: ... Attach Drawer Page 25 of 71 1317809001 Rev A 1 2x 2 2x 2 ...

Page 26: ... Install Drawer Lock Page 26 of 71 1317809001 Rev A 1 2 3 4 NOTE Ensure that the circular lock indicator and the lock arm are both facing up when installing 5 6 7 lock indicator lock arm ...

Page 27: ... Page 27 of 71 1317809001 Rev A 45o or 1 30 C L 3 00 45o TURN 90 o Removal of Plastic Lock Plug and Installation of Lock Cylinder 1 2 3 4 5 ...

Page 28: ... Page 28 of 71 1317809001 Rev A Front Removal of Lock Cylinder REMOVAL TOOL REMOVAL TOOL TOOL RK XF TOOL RK FR 90 o 1 2 3 ...

Page 29: ... Attach Drawer Panel Page 29 of 71 1317809001 Rev A 1 2 3x 3x 6x 2 ...

Page 30: ... Verify that Foundation is Level Center Column in Final Location Page 30 of 71 1317809001 Rev A 1 2 ...

Page 31: ... Page 31 of 71 1317809001 Rev A 2 Install Upper Column Stabilizer Bracket to Foundation 2x M6x20 1 3 ...

Page 32: ... Attach Upper Stabilizing Bracket to Column Page 32 of 71 1317809001 Rev A 2x M8x10 1 2x M8x14 ...

Page 33: ... Page 33 of 71 1317809001 Rev A Attach Shroud to Column NOTE Be careful not to scratch column when sliding into place 2 4 2x 2x M8x8 1 3 ...

Page 34: ... Page 34 of 71 1317809001 Rev A Attach Column Lid 2 1 2 3 4 NOTE If installing Tower onto Foundation skip to page 53 1 ...

Page 35: ... Page 35 of 71 1317809001 Rev A Collab Table Lay P E T into Position 2 1 ...

Page 36: ... Page 36 of 71 1317809001 Rev A Collab Table Attach Cantilever 2 1 Locate screws ...

Page 37: ...71 1317809001 Rev A Collab Table Use Set Screws to Level 1 2 Hand tighten M8 screws Adjust set screws to level 3 Fully tighten all M8 screws NOTE Level the cantilever slightly high on far end 5 4x M8 2x M10 4 1 3 2 ...

Page 38: ... Page 38 of 71 1317809001 Rev A Personal Table Lay P E T into Position 1 2 ...

Page 39: ... Page 39 of 71 1317809001 Rev A Personal Table Attach Cantilever 1 2 Locate screws ...

Page 40: ... of 71 1317809001 Rev A Personal Table Use Set Screws to Level NOTE Level the cantilever slightly high on far end 5 4x M8 2x M10 1 2 Hand tighten M8 screws Adjust set screws to level 3 Fully tighten all M8 screws 4 ...

Page 41: ... Page 41 of 71 1317809001 Rev A Attach Power Box to Cantilever 4x 1 4x 2 NOTE See page 12 for cable routing ...

Page 42: ... Page 42 of 71 1317809001 Rev A Attach Subtop to Cantilever Collab Table 1 2 3 2x M8x10 2x M8x8 ...

Page 43: ... Page 43 of 71 1317809001 Rev A Attach Subtop to Cantilever Personal Table 2 1 NOTE If Worksurface is glass corian this will come installed to top 4 17x 2 2x 10 Install these screws first 4x M6x6 3 ...

Page 44: ... Page 44 of 71 1317809001 Rev A Attach Modestly Panel Bracket Perpendicular Table 1 2 6x 10 ...

Page 45: ... Page 45 of 71 1317809001 Rev A Attach Modestly Panel Perpendicular Table 1 2 4x ...

Page 46: ... Page 46 of 71 1317809001 Rev A Attach Worksurface to Cantilever NOTE Use pilot holes to attach 2 1 WORKSURFACE FOUNDATION 1 14x 2 Start attachment with the 4 screws boxed ...

Page 47: ... Page 47 of 71 1317809001 Rev A Attach Power Grommets 1 2 3 4x M4 ...

Page 48: ... Page 48 of 71 1317809001 Rev A Attach C Clamp Brackets 2x 1 2 NOTE Rock c clamp into place ...

Page 49: ... of 71 1317809001 Rev A Secure Power Box inside Cantilever NOTE Zip tie all wires to the Cantilever they cannot be hanging down NOTE Secure power box with screws into wood or zip tie to understructure 1 2 2x 2 ...

Page 50: ... Page 50 of 71 1317809001 Rev A Attach Up Down Lever to Worksurface and Power 2x 3 3 GLASS CORIAN TABLE WOOD TABLE 2 2x 2x 1 ...

Page 51: ... Page 51 of 71 1317809001 Rev A Attach P E T to Underside of Worksurface 1 2 8x NOTE Bend P E T to slip brackets into final position ...

Page 52: ... Page 52 of 71 1317809001 Rev A Attach Final Cover Plate to P E T Parallel Perpendicular 1 1 2 2 3x 3x ...

Page 53: ... Page 53 of 71 1317809001 Rev A Tower and Shroud Installation ...

Page 54: ... Page 54 of 71 1317809001 Rev A Assemble Z Brackets to Bottom Weldment 1 2 Bottom View 6x M6 12mm ...

Page 55: ... Page 55 of 71 1317809001 Rev A Attach RH Upright Weldment to Bottom Weldment 1 2x M6 2 SIDE VIEW UP ...

Page 56: ... Attach LH Upright Weldment to Bottom Weldment 1 2x M6 2 Page 56 of 71 1317809001 Rev A ...

Page 57: ... Attach Upper Weldment to both RH LH Uprights 1 4x M6 2 Page 57 of 71 1317809001 Rev A ...

Page 58: ... Attach Center Column s 1 2 Page 58 of 71 1317809001 Rev A 8x M6 8mm ...

Page 59: ... Attach Shelves to Column 1 Page 59 of 71 1317809001 Rev A 2 8x 8x M6 8mm ...

Page 60: ... Attach Tower to Foundation 1 Page 60 of 71 1317809001 Rev A 8x 10 32 2 8x 3 ...

Page 61: ... Place Top Skin onto Foundation Page 61 of 71 1317809001 Rev A 1 2 Place supplied felt pad in space between foundation and top skin ...

Page 62: ... Attach Shelf Light Page 62 of 71 1317809001 Rev A 1 2 3 NOTE Light is attached magnetically NOTE Manage cords with tape vertical pillars preferable 5 6 2x 4 ...

Page 63: ...Bracket Installation Page 63 of 71 1317809001 Rev A 1 2 1 Choose shroud location and attach bracket s BACK OF TOWER FRONT OF TOWER NOTE Slide shroud flange into bracket 1x M6 3 FRONT OF TOWER 2x M6 2 NOTE Bend until complient TOP VIEW ...

Page 64: ... Full Shroud Installation Page 64 of 71 1317809001 Rev A 2 1 NOTE Slide shroud flanges into bracket 4 2x M6 FRONT OF TOWER 3 NOTE Bend until complient TOP VIEW ...

Page 65: ...or Installation Page 65 of 71 1317809001 Rev A 2 1 Burn holes from inside screen 13mm from up from top of flange 13mm 4x 4 3 4x 4x M6 5 6 4x T30 NOTE Install monitor mounts and monitor per vendor instructions ...

Page 66: ... Attach Shroud Cover Page 66 of 71 1317809001 Rev A 1 2 4x 3 4 5 4x ...

Page 67: ...ral Engineer of Record is responsible for the design of building walls and floors which Mackinac products are attached to and must verify the adequacy of the mounting hardware even if provided by Steelcase The building owner or designated agent is responsible for verifying that the installation is in compliance with all local codes and regulations CRUSH HAZARD FAILURE TO PROPERLY SECURE MACKINAC P...

Page 68: ...G Drywall with Wood Studs Stud grade SPF DF L or Hem Fir 1 5 x 3 5 Studs on maximum 24 centers Must be at least 5 8 thick Type X gypsum drywall per ASTMC36 ASTMC1396 and CAN CSA A82 27M Secure wood blocking 1 1 2 x 5 1 2 stud grade SPF DF L or Hem Fir to the wood studs The upper wood blocking is to be 24 from the floor The lower wood blocking is to be SECURELY FASTENED TO THE FLOOR FOR MIN BLOCKIN...

Page 69: ...Maximum Load Value and Load Location to Determine the Correct Wall or Floor Fasteners for NON SEISMIC APPLICATIONS only For Seismic Applications consult the SEOR Structural Engineer of Record Perpendicular Application Parallel Application Total Weight 1043 81 lbs Total Weight 1053 36 lbs Collaborative Application Total Weight 1031 29 lbs 425 34 16 746 193 6 7 622 53 47 2 10 106 93 4 21 ...

Page 70: ... Page 70 of 71 1317809001 Rev A Attach Column to Wall Mount 1 2x M8x10 ...

Page 71: ... to Column NOTE Be careful not to scratch column when sliding into place IMPORTANT After this page reference pages 33 52 for next installation steps TIP Base trim needs to be removed to allow wall plate to set flush against wall 4 2x 2x M8x8 2 1 3 ...

Reviews: