![Steelcase Currency Workwall Manual Download Page 12](http://html1.mh-extra.com/html/steelcase/currency-workwall/currency-workwall_manual_1369499012.webp)
Page 12 of 12
939500279 Rev E
Grommet Installation
NOTE:
The following is applicable to
all scenarios. 3 unit is shown as an
example.
1.
Determine placement of
grommet. Check under shelf for
possible interference with
bases or hardware Make sure to
stay 1-1/2" - 2" away from cams
and pins that are used to assemble
the unit.
2.
Apply masking tape over area to
avoid chipping of laminate.
3.
Mark and drill a 1/8" dia. pilot
hole through the shelf. Bore a hole
with 3" (76.2 mm) dia. drill bit all the
way through the shelf.
4.
Carefully remove tape.
5.
Slide grommet into hole.
NOTE:
Grommet can be glued
into hole if desired.
D
E
2
3” DRILL BIT
3a
3b
5
1/8” DRILL BIT
GROMMET
®