46
738.977 | 1149
EN
8.3
Remote display with 2 or 3 monitor-
ing units
1. Start initial commissioning of one of the systems, hereaf-
ter known as
System A
.
Perform
only the steps
Remote display with 1 monitoring unit
p. 46.
2. Replace the monitoring unit display of the next system
(
System B)
with the display from
System A
.
3. Perform initial commissioning of
System B
, as described
in step 1 for
System A
.
4. Replace the monitoring unit display of the next system
(
System C)
with the display from
System B
.
5. Perform initial commissioning of
System C
, as described
in step 1 for
System A
.
Remote display with 1 monitor-
. The following applies:
–
After the display test, the number of HF connections
that have been established is displayed:
rF
2
or
rF
3
.
The system is now ready for operation.
–
The specified output and power values are now the
respective summed values of the three individual
systems.
–
System messages are displayed alternately:
• Error message:
Err
and the error number
• System letter A, B or C (
A
,
b
,
C
), inverter number
and error code
Example (see adjacent Fig.):
Err
1
/
A02.40
Err
2
/
b01.44
More information on this is provided in
OFF
STANDBY
ACTIVE
W/ m
2
kWh
C
IRRAD
POWER
TEMP
ENERGY
/D
/Y
/M
/W
OFF
STANDBY
ACTIVE
W/ m
2
kWh
C
IRRAD
POWER
TEMP
ENERGY
/D
/Y
/M
/W
OFF
STANDBY
ACTIVE
W/ m
2
kWh
C
IRRAD
POWER
TEMP
ENERGY
/D
/Y
/M
/W
OFF
STANDBY
ACTIVE
W/ m
2
kWh
C
IRRAD
POWER
TEMP
ENERGY
/D
/Y
/M
/W
OFF
STANDBY
ACTIVE
W/ m
2
kWh
C
IRRAD
POWER
TEMP
ENERGY
/D
/Y
/M
/W
OFF
STANDBY
ACTIVE
W/ m
2
kWh
C
IRRAD
POWER
TEMP
ENERGY
/D
/Y
/M
/W
Summary of Contents for StecaGrid Control I1
Page 90: ...90 738 977 1149 Zertifikate Certificates Certificati...
Page 92: ...738977...