STAUFF STA-CK-SKK Instruction Manual Download Page 8

www.stauff.com

AUSTRALIA

STAUFF Corporation Pty Ltd

Tel.: +61 2 4271 9000
[email protected]

INDIA

STAUFF India Pvt Ltd

Tel.: +91 20 66 20 2471

[email protected]

POLAND

STAUFF Polska Sp. z o.o.

Tel.: +48 58 660 11 60
[email protected]

BRAZIL

STAUFF Brasil Ltda
Tel.: +55 11 47 72 72 00
[email protected]

IRELAND

STAUFF Ireland
Tel.: +44 28 92 60 69 00

[email protected]

RUSSIAN FEDERATION

STAUFF LLC
Tel.: +7 495 276 16 50
[email protected]

CANADA

STAUFF Canada Ltd
Tel.: +1 416 282 46 08
[email protected]

ITALY

STAUFF Italia S.r.l
Tel.: +39 0362 63 80 70
[email protected]

THAILAND

STAUFF (Thailand) Co Ltd
Tel.: +66 2 712 25 98
[email protected]

CHINA

STAUFF China
Tel.: +86 21 68 18 70 00
[email protected]

KOREA

STAUFF Korea Ltd
Tel.: +82 51 266 66 66
[email protected]

UNITED KINGDOM

STAUFF UK Ltd
Tel.: +44 114 251 85 18
[email protected]

FRANCE

STAUFF S.A.S.
Tel.: +33 2 54 50 55 50
[email protected]

MALAYSIA

STAUFF South East Asia Sdn Bhd
Tel.: +60 3 8024 61 68
[email protected]

UNITED STATES

STAUFF Corporation
Tel.: +1 201 444 78 00
[email protected]

GERMANY

Walter Stauffenberg GmbH & Co. KG

Tel.: +49 23 92 916 0
[email protected]

NEW ZEALAND

STAUFF Corporation (NZ) Ltd 
Tel.: +64 9 912 1530
[email protected]

VIETNAM

STAUFF Vietnam Ltd

Tel.: +84 8 3995 47 23
[email protected]

Summary of Contents for STA-CK-SKK

Page 1: ...Direct Accumulator Charging Kit STA CK SKK INSTRUCTION MANUAL...

Page 2: ...coupling the safety gauge directly to the SKK gas valve connection on the STAUFF accumulator Features The standard kit is delivered in a storage case containing the following 1 1 x Charging valve 2 1...

Page 3: ...umulators In cases where the gauge and gauge adaptor will be left on the accumulator make sure that the gauge fitted is rated for the maximum system pressure of the hydraulic circuit 7 Never use an ac...

Page 4: ...ength 2000 mm Test Coupling 1 4 BSPP Connection 4 STAUFF SKK Gas Valve Coupling SKK Test Coupling 1 4 NPT for regulator connection Ensure appropriate thread sealing compound is applied prior to connec...

Page 5: ...nnection flow chart Remove the protection cap on the SKK gas valve coupling F fitted to the gas side of the accumulator Select the safety pattern pressure gauge and adaptor 3 and couple directly to th...

Page 6: ...on the nitrogen gas source until a small amount of gas can be heard coming from the bleed valve D which should be open After 5 seconds 0 7 Ltr 4 Ltr and 10 to 20 seconds 10 Ltr 55 Ltr slowly close th...

Page 7: ...upling 2 fitted to the regulator Slightly open the valve on the nitrogen gas source until a small amount of gas can be heard coming from the bleed valve D which should be open After 5 seconds 0 7 Ltr...

Page 8: ...l 39 0362 63 80 70 sales stauff it THAILAND STAUFF Thailand Co Ltd Tel 66 2 712 25 98 sales stauff co th CHINA STAUFF China Tel 86 21 68 18 70 00 info stauff com cn KOREA STAUFF Korea Ltd Tel 82 51 26...

Reviews: