34
Illustration
6.
Installation
Check
4. Drill holes for the remaining four screws.
5. Hang the unit again by the first screw, and then
insert and tighten the remaining four screws.
6. Take waterproofing measures so that water does
not enter the building from screws mounting the
device.
• Make sure the unit is installed securely so that it
will not fall or move due to vibrations or earth-
quakes.
Securing to the wall
Mounting Bracket
(upper)
Tapping Screw
Location of Screw Hole
1. Drill a single screw hole, making sure to hit a stud.
2. Insert and tighten the screw and hang the unit by
the upper wall mounting bracket.
3. Determine the positions for the remaining four screws
(two for the top bracket and two for the bottom), and
remove the unit.
• The weight of the device will be applied to the wall. If the strength of the wall is not suffi-
cient, reinforcement must be done to prevent the transfer of vibration.
• Do not drop or apply unnecessary force to the device when installing. Internal parts may
be damaged and may become highly dangerous.
• Install the unit on a vertical wall and ensure that it is level.
Locating Screw Holes
Locating Screw Holes
Mounting
Structure
Caution
• When installing with bare hands,
take caution to not inflict injury.
• Be careful not to hit electrical
wiring, gas, or water piping while
drilling holes.
Item