Task Detail Window
You will be presented with this menu when adding a new task or modifying an existing
task.
You can manually enter the path (i.e.
C:\Directory
) in the Source and Destination
Directory boxes, if you know them. Otherwise, click
Browse
and select the directories
from the Browse Directory window (see above). Once you have selected the source
(from the computer) and destination (to the enclosure) directories for the task, you can
modify the attributes and options below.
Attributes:
Active
The task is active and will be run when the backup button is
pushed. This setting can also be managed from the Task Status
window (see below).
Subdirectory
When checked, includes any subdirectories contained inside the
selected directories. When unchecked, copies the selected directories
only and ignores any subdirectories.
Overwrite
When selected, read-only files will be copied over without prompting
you for permission.
Newer
Compares the dates on the files in the directories and copies only the
files on the computer that have been modified.
Instruction Manual
7
The Task Detail Window
The Browse Directory Window