12
STAR TRAC E SERIES TOTAL BODY TRAINERS O
WNER
’
S
M
ANUAL
Remove the (2) M4 x 0.7 screws from the display back (retain for later use) with a
#2 Phillips screwdriver and separate the back of the display from the front. .
Slide the back of the display with the mounting bracket onto the upper neck of the
Total Body Trainer. Line up all four holes and secure with (4) M6 x 50mm Socket
Head Cap Screws and (4) M6 Washers. Tighten down with the 5mm hex key.
Tighten to 240 lb-in (27 N-m).
Plug in the 12 pin display cable from the neck into the front display circut board at
J4. Next plug in the Heart Rate cable from the handlebars into the HR board, then
plug the HR ground into the quick disconnect tab on the diplay frame.
NOTE:
If you are installing Entertainment, Refer to the PVS Install guide before this
step.
If you are not installing Entertainment, take Coax and DC power and return them
down the neck.
Slide the bottom of the front display under the 2 tabs at the base the the mount.
Press display against the round bar and rotate it to the back. Be careful not to
pinch any wires.
Secure the Front display to the back with (8) M4 x 0.7 x 19mm long Phillips Head
Screws. DO NOT overtighten.
3.
Install the Upper Body Arms
Locate left side upper body arm, move to left side of the Total Bodt Trainer. Locate
hub. NOTE: One of the holes on the hub has no threads, this is clocking hole for
the pin on the upper body arm.
M4 x 0.7
Heart
Rate
Board
J4
Ground
Wire
Quick
Disconnect
Tab
M6 x 50mm
Washers
M4 x 0.7
M4 x 0.7
HUB
UPPER BODY
ARM