
7
7
G
B
ASSEMBLY
Following the assembly directions below, you will
assemble the front tine tiller in a few minutes.
1.Place tilling tines on the tine shaft on both sides
of the gear box. Line up the holes in the tine frame
sleeves and tine shaft. Insert clevis pins through
the holes in tine frames and tine shaft. Insert cotter
pins through the holes in the clevis pins to secure
them.(Fig.3)
11/12
5
9
8
5
fig.2
2. Install the resistance rod support with clevis pin,
and tight them with cotter pin. Insert the resistance
rod in the hole of resistance
rod support, then lock them with lock lever in
desired position.(Fig.3)
fig.3
6
10
3. Mount the girder on the tiller with 2
M8*70 screws and flange nuts.(Fig.4)
fig4
2
14/15
4. Install the handle on the girder with M 8*70
screw, washer and flange nut, then insert the
lock lever in desired position to secure the top of
handle(Fig.5).
fig.5
12/17/24
17/23/25
5. Install the safety plate with 2x M 6*35 screws,
washers and flange nuts.(Fig.6)
fig.6
7
18/19/20
6. Mount the Wheel assy on the tiller with M 8*50
screw and flange nut, then hang extension spring
(Fig.7).