1.
Lift up two insulating lids on the top of the cooker.
2.
Using a 7mm allen key, unscrew 2 countersunk
retaining bolts. (See Fig. 9).
3.
Insert M12 eye hooks into hotplate. (See Fig. 10).
4.
Using lifting hooks, lift hotplate vertically and withdraw.
5.
Re-assemble in reverse order, noting that it is
recommended to coat the countersunk bolts with anti-
seize compound prior to fitting.
SEE FIG. 11
1.
Remove the top oven door and place in a safe
position.
2.
Remove rear and base access doors use hex. driver.
3.
Thoroughly clean top, side and base flueways through
access apertures with brush.
4.
Remove all debris with vacuum cleaner.
5.
Replace rear and base access doors. Secure in
position using hex. driver.
6.
Brush and clean in between hotplate ribs on
underside.
7.
Examine soft rope seal located around hotplate
aperture in top plate and rope seal on hotspot.
Replace if frayed or damaged.
8.
Replace hotplate ensuring the underside ribs lie over
the boiler and that it seals to the top plate.
8
Cleaning
FIG. 11
DESN 514820
OVEN & HOTPLATE FLUEWAY
CLEANING
HOTPLATE REMOVAL
FIG. 9
FIG.10
DESN 514841
DESN 514858
Summary of Contents for Alpha 120
Page 19: ...Replacement of parts Electrical controls FIG 34 DESN 514830 19 ...
Page 26: ...26 FIG 43 Fault Finding ...
Page 30: ...30 Fault Finding ...
Page 31: ...Fault Finding 31 ...
Page 32: ...32 Fault Finding ...
Page 33: ...33 Fault Finding ...
Page 35: ...35 ...