![Stahl MCP/BG Series Operating Instructions Manual Download Page 11](http://html1.mh-extra.com/html/stahl/mcp-bg-series/mcp-bg-series_operating-instructions-manual_1357746011.webp)
250318 / MCP60300110
2021-01-26·BA00·III·en·02
Mounting and Installation
11
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
Flameproof Manual Call Points
Series MCP/BG
7.3
Installation
7.3.1 Preparation for electrical Installation
Removing the cover
• Remove 4 screws.
• Lift the MCP front cover together with the middle frame.
DANGER
Explosion hazard due to open holes, unused cable entries and cable glands!
Non-compliance can result in severe or fatal injuries.
• Only use approved and flameproof (Ex d) cable glands.
• When selecting cable entries, observe the thread type and thread size
in the component documentation.
• Seal thread with non-hardening thread sealant.
• Always close unused holes, cable entries and cable glands using
approved stopping plugs or plugs. Observe IEC/EN 60079-14 for this.
• Correct reassembly of the unit is required to ensure ingress protection
to IP 66.
16563E00
1 Cheese-head screws
M5 x 16
2 MCP front cover together
with middle frame
3 PCB mounting screw
4 PCB
5 MCP base
A retaining strap is fitted between the base and front cover.
Depending on the variant of MCP which has been selected the PCB may or
may not have to be removed during installation.
Details about this can be found in the "Electrical connection" chapter.
5
4
3
2
1