CPU module for Zone 2 / Division 2
Series 9442/35
6.3.2 Connect Ethernet
19636E00
Connect the primary Ethernet line with lokking hook on the standard RJ45 plug
connector to the X2P1 RJ45 socket until it audibly engages.
Connect the secondary Ethernet line with locking hook on the standard RJ45 plug
connector to the X2P2 RJ45 socket until it audibly engages.
Secure connection lines against tensile loads and scuffing.
Connect the at least one point of the shielding of the Ethernet line with the equipotential
bonding.
7
Parameterization and Commissioning
Before commissioning, carry out the following checks:
Mounting and installation of the device according to regulations.
Correct, secure connection of the connection lines.
No damage to the device and the connection lines.
Secure fit of the mounting and safety screws.
Do not commission the device until it has been successfully tested.
For information on parameterisation, see the corresponding coupling description.
IP address setting for service bus: manual or DHCP assignment
(can be selected by the user via a web server or IS1+ detect software.
Default 192.168.1.101)
Note: If the DHCP setting is selected and no DHCP server can be reached,
the alternative IP address 169.254.0.1 is set automatically.