Parameterization and Commissioning
Before commissioning, ensure the following:
• Installation of the device according to regulations.
• Correct connection of the cables.
• No damage at the device and connection cables.
• Tight seat of the screws at the terminals.
Correct tightening torque: 0.5 to 0.6 Nm.
9.1
Parameterizations
Parameterisation and commissioning of the CPM and of the connected I/O modules is
carried out using the automation system and the ServiceBus (optional).
Only the fieldbus address of the CPM must be set directly at the module.
The buttons of the LCD display can be used
• to set the fieldbus address of the device
• Display information about the device and the I/O modules installed on the BusRail
(see "Displays" chapter).
9.1.1 LCD Displays
Switch to a specific module display
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
LCD display
Settings
12258E00
• Initial display (shown on the left)
12259E00
• Press the
▲
and
▼
buttons simultaneously to switch from the system level
to the module level. The following display appears (shown on the left).
• Select the desired module by pressing the
▲
or
▼
button.
• Press the
▲
and
▼
buttons simultaneously. The display switches to the
information level.
• Press the
▲
or
▼
button to switch between different LCD displays
(see following table).
FBAdr
FB
I/O
120
OK
OK
CPM
active
9440/15-01-11