7.8
Earth Connection
- FX15 must be connected to a good quality earth.
- The internal Earth connection is the primary point. The external connection is for a
supplementary bonding connection and is used where local code or authorities permit
or require such connection.
8
Putting into Service
Before commissioning, ensure that:
- no components are damaged
- the device has been installed according to regulations
- there are no foreign bodies inside the device
- all screws and nuts have been firmly tightened
- the prescribed tightening torques have been observed
- connection has been made correctly
9
Maintenance, Overhaul and Repair
9.1
Regular Maintenance Work
- Consult the relevant national regulations (e.g. IEC/EN 60079-17) to determine the type
and extent of inspections.
- Plan the intervals such that any expected defects in the equipment are detected
promptly.
To check as part of maintenance:
- Check if the cables are clamped properly.
- Inspect the device for signs of visible damage.
- Compliance with the permitted temperatures in accordance with IEC/EN 60079-0.
- Make sure that the device is used according to its designated use.
15761E00
WARNING
Check the device before commissioning!
To ensure the correct operation, check the device before commissioning.
WARNING
Risk due to unauthorized work being performed on the device!
Risk of injury and damage to equipment.
Assembly, installation, commissioning, operation and maintenance must
only be carried out by appropriately authorized and trained personnel.