226834 / 972160310010
2014-06-18·BA00·III·en·00
Parameterization and commissioning
13
Media Converter FX op is / TX SC
Series 9721/13-11-.4
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
9
Parameterization and commissioning
No parameterization has to be carried out at the media converter 9721.
Before commissioning, make sure that:
• the device has been installed according to regulations,
• the cables have been connected correctly,
• the device and the connection cables are not damaged,
• the screws in the terminals have been tightened firmly. Make sure, that the correct
tightening torque is used (chapter "Installation").
10
Operation
10.1 Operation
After locking the electrical lines into place, connecting them and observing the
appropriate commissioning steps (see chapter "Parameterization and Commissioning"),
the auxiliary power source must be switched on.
10.2 Indication
Meaning of the LEDs
WARNING
Check the device before commissioning!
Explosion protection is impaired!
• Observe the inspection requirements in the current national regulations
before commissioning in order to maintain the explosion protection.
• Check the device for proper installation and function before
commissioning.
16312E00
LED
“yellow“
Status at the FO port
LED
“green“
Status at the RJ45 port