Mounting and installation
12
223845 / FL6060300010
2018-04-13·BA00·III·en·01
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
Explosion Proof Visual Signal -
5, 10 or 20 Joule
Series FL60
7.2.3 Reassembly of enclosure
Inserting the PCB
For correct positioning of the PCB there are 2 grooves in the enclosure.
Depending on the version, insert the PCB in the corresponding groove!
• With the electrical lines connected, carefully lower the PCB back into the correct
position in the enclosure.
• Ensure the flash tube is clearly visible and centrally located in the glass dome.
• Slowly and carefully, the end cap must be inserted squarely into the enclosure.
Do not use force.
• Replace cheese-head screws M5 x 16 (see information below) and tighten the screws
with a tightening torque of 3 Nm.
18814E00
18813E00
• FL60/./D50/./..
• FL60/./F50/./..
• FL60/./D100/./..
• FL60/./D200/./..
• FL60/./F100/./..
• FL60/./F200/./..
• FL60/./L50/./..
• FL60/./L100/./..
• FL60/./L200/./..
• FL60/./N50/./..
• FL60/./N100/./..
• FL60/./N200/./..
• Carefully assemble the device to ensure that the degree of protection
is IP 66.
• The cheese-head screws are delivered with Nyltite seals
(see the "Connection" section above).
• Check the Nyltite seals for damage before the installation.
• Tighten cheese-head screws with a torque of 3 Nm.
• Use the Nyltite seal a maximum of five times with the tightening torque.