Power module for Zone 1
Series 9445/32
▶
Connect the connection line in accordance with the following table:
▶
Secure the connection line against tensile load and scuffing.
Disconnecting
▶
Loosen the safety screws on the auxiliary power plug.
▶
Swivel the lever for the plug forwards. This pries the auxiliary power plug out of the power
module, enabling it to be removed.
7
Parameterisation and Commissioning
Before commissioning, carry out the following checks:
▶
Mounting and installation of the device according to regulations.
▶
Correct, secure connection of the connection lines.
▶
No damage to the device and the connection lines.
▶
Secure fit of the mounting and safety screws.
▶
Do not commission the device until it has been successfully tested.
8
Operation
8.1
Operation
▶
For device operation, observe the information in the "Intended use" and
"Parameterisation and commissioning" chapters.
8.2
Displays
LEDs on the device indicate the operating state of the device
(see also the "Intended use" and "Device design" chapters).
Variant
Item no.
Core colour
Connection
1
261232
dark blue
"+24 V" supply voltage
dark blue/white
"GND" supply voltage
2
272278
violet
"+24 V" supply voltage
dark blue
"GND" supply voltage
For information on parameterisation, see the corresponding coupling description.
After the system is switched on, the CPU checks the firmware versions. If the version
installed in the power module is older than the version installed in the CPU, it will be
updated to the new version automatically. The "PWR OUT" and "M/S" LEDs blink during
the update.
LED
Colour Meaning
PWR IN
green Auxiliary power operation indication
M/S
blue
Requires maintenance or outside specification
PWR OUT
green Operation indication for the power supply for the
Remote I/O system