Commissioning
14
153237 / 8579606300
2020-11-10·BA00·III·en·08
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
SolConeX Plug, 63 A
Series 8579/12
8
Commissioning
Before commissioning, ensure the following:
• Check the mounting and installation.
• Enclosure must not be damaged.
• Remove any foreign bodies.
• If necessary, clean the connection chamber.
• Check if the conductors have been inserted correctly.
• Check whether all screws and nuts have been tightened firmly.
• Check whether all conductors have been clamped firmly.
• Observe the line voltage.
9
Operation
The plug can be used with the following R. STAHL products:
• Wall-mounting sockets 8579/11 and 8579/31
• Maintenance socket 8579/51 and 8579/61
The plug can be used with industrial type sockets in accordance with DIN EN 60309.
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
DANGER
Explosion hazard due to malfunction of the device after a short circuit in
the electric circuit!
Non-compliance results in severe or fatal injuries.
• Check the functionality of the plug after a short circuit.
• Replace defective devices immediately.
DANGER
Explosion hazard due to damp, dirty or dusty components!
Non-compliance results in severe or fatal injuries.
• Only insert the plug into the socket if it is dry and free of dirt and
dust.
The plug may only be used when fully mounted.