![STA-RITE PCD-10B Installation, Operation & Parts Download Page 4](http://html1.mh-extra.com/html/sta-rite/pcd-10b/pcd-10b_installation-operation-and-parts_1356482004.webp)
4
Step 6:
Slide the float over the end of the float rod. Move it up the rod far
enough to allow you to install the rubber rod stop on the switch rod
beneath the float.
Step 7:
Adjust the rod stop on the nibs on the rod to give the desired pumping
range.
Step 8
: Attached discharge hose or piping to pump discharge with 1-1/4” NPT
fittings. Use discharge hose or pipe of 1-1/4” diameter or larger. Make
sure that pump outlet is not restricted.
Step 9:
Make sure air bleed hole is not plugged (see Figure 4). If it is plugged,
DISCONNECT POWER to pump and use a small piece of wire to
clean it.
Pump will
remove water
to here without
a float switch.
Vertical float
switch mounts
here (switch
omitted for
clarity).
Weep Hole
(Anti-airlock)
.05"
FIGURE 4
6
7
FIGURE 3
Summary of Contents for PCD-10B
Page 8: ...S958 Rev B 04 14 10 S958...