9
Precautions for measurement
Measure Resistance Point -to-Point(Rtt)
1. Do not cean the surface of material
2. Remove from the surface only those items that might interfere with the test. ESD
sensitive devices shall also be removed.
3. Connect both test cable to both (2.27kg=5lbs) electrodes, and place the electrode on the
most commonly used area of the surface. Use the 10" electrode spacer to space from
apart from each other.
4. Push the red pushbutton to perform a measurement. Shoud the 15-second elecrification
period appear, it may be bypassed by pusshing the red pushbutton again.
6. Push the right black puschbutton to save the measurement.
7. Perform additional measurements by placing the electrode on the most commonly used or
worn area.
The tempareture inside the testing area needs to be around 24
℃
±1.7
℃
(Temperature) at 40 ~60%(relative
Humidity). The test equipements need to stay under such enviroment around 1 hour for proper readings.
The meter cannot be noemalized inside objects, enclosed boxed, containers or cased. The temperature
inside an eclosed case wil differ from the ourside temperture. These case will act as insulators. The test
equipement must remain sttionay in the testing area for about 1 hour without any significant changes to
the temperature.
Note: Accuracy is measured after normalizing the meter for a minimum of 1 hour.
PRESS RED SWITCH QUICK
TEST
Data Save
1. Start to mearure
[TEST]
2. Data saving
[SAVE]
Press Red Button.
Press right black button.
3. Memory select
[SELECT]
Select the memory number and press Red button.
About Delete the memory data, please reffer Page 7
SELE
CT