STEP 4
Insert 4 M8x16TS screws in the 13x25S dowels as shown in pic.4.
FASE 3
Far scorrere i profilati
SPC
e posizionarli come indicato in fig.3.
STEP 3
Slide the
SPC
bars and place them as shown in pic.3.
Figura 3
FASE 4
Inserire 4 viti M8x16TS nei tasselli 13x25S come indicato in fig.4.
Figura 4
5
© Tu$ i diri$ riserva-
- © All rights reserved