![SRC NC750-14-01-SL Scope Of Supply/Bill Of Material & Mounting Drawings Download Page 4](http://html1.mh-extra.com/html/src/nc750-14-01-sl/nc750-14-01-sl_scope-of-supply-bill-of-material-and-mounting-drawings_1354017004.webp)
Copyright By SRC
Design and Specification are subjected to change
Page 4
Step 3:
Slide-in the Top Plate (2), as shown
and orient the mounting holes in-line
with the 4 Projecting screws.
Step 4:
Secure the threads on the screw using
M6 Nut (5), as shown.
As is Mounted condition of the Plate cluster ,
after Insertion of the Countersunk Head M6 x 20
Screws from the Bottom side, and flushing the
countersink contours of the screws and the
Bottom plate.