SPX Marley NC Series Installation Operation & Maintenance Download Page 18

18

entire tower would indicate. Wintertime operation of multicell towers at 
low cold water temperature levels requires that the operator be especially 
watchful.

  2.  As cold air enters the louvers, it causes the water flowing over the fill to be 

drawn inward toward the center of the tower. Thus, under fan operation, the 
louvers and lower periphery of the tower structure remain partly dry, see-
ing only random splashing from within the tower—plus normal atmospheric 
moisture from the entering air. Such lightly wetted areas are most subject 
to freezing.

    Therefore, if excessive ice forms on the louvers, stop the fan for a few 

minutes. With the fan off, the water flow will increase in the vicinity of the 
louvers and reduce the ice buildup. 

3.   Under extended extreme cold conditions, it may be necessary to operate 

the fan in reverse. This forces warm air out through the louvers, melting any 
accumulated ice—adequate heat load must be available. Reversal of fan 
should only be done at half speed or less. Reverse operation of the fan 
should be used sparingly and should only be used to control ice, not to 
prevent it. Reverse fan operation should not need to exceed 1 or 2 minutes. 
Monitoring is required to determine the time required to melt accumulated 
ice.

Operating the fan in reverse at half speed for prolonged periods 
during subfreezing weather can cause severe damage to fans and 
fan cylinders. Ice can accumulate inside fan cylinders at fan blade 
plane of rotation and fan blade tips will eventually strike this ring of 
ice, damaging the fan blades or cylinder. Ice can also accumulate 
on fan blades and be thrown off, damaging fan cylinder or blades. 
Allow a minimum of 10 minute delay between reverse operation 
and forward operation during subfreezing weather to permit ice to 
dissipate from fan blades and fan cylinders. See Fan Drive Caution 
Note in the Mechanical Equipment Installation section of this manual.

4.   With no heat load on the circulating water, icing cannot be controlled 

effectively by air control during freezing weather. Towers must not be 
operated with reduced water rate and/or no heat load during 
freezing weather.

 If the circulating water system cannot be shut down, 

water returning from the process should be made to bypass the tower. If 
a bypass is used, all water must be bypassed without modulation. If the 
water bypass is directly into the tower's cold water basin, its design must 
be approved by SPX Cooling Technologies.

 

Warning

operation

Summary of Contents for Marley NC Series

Page 1: ...NC steel cooling tower I N STALLATION OPE RATION MAI NTE NANCE Z0628276 rev A I SSU E D 05 2015 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT US E R MAN UAL...

Page 2: ...ng tower Carefully read the manual before installation or operation of the tower and follow all instructions Save this manual for future reference Indicates presence of a hazard which can cause severe...

Page 3: ...ranty If you have questions about the operation and or maintenance of this cooling tower and you don t find the answers in this manual please contact your Marley sales representative When writing for...

Page 4: ...ccess platform Tower Location Space available around the tower should be as generous as possible to pro mote ease of maintenance and to permit freedom of airflow into and through the tower If you have...

Page 5: ...es per cell The upper module includes hoisting clips at the top of the module The hoisting clips on the lower module are located near the bottom on the sides of the cold water basin All other models s...

Page 6: ...amsandfromthetopofthebottommoduleandremoveshipping cover from bottom of top module replace fasteners at side of module to preventleaks Placetopmoduleonthetopperipheralbearingsurface factory installedg...

Page 7: ...ropriately sized circular opening has been provided to accept a 125 ANSI B16 1 flat face flange connection Side outlet sump connection Unless otherwise specified sumps are manufactured of heavy duty F...

Page 8: ...place of the standard elbows normally required for inlet connection and 2 provide means of regulating flow to both sides of the tower Remove the center inlet flume assembly to gain access for attachm...

Page 9: ...t cycling the tower will cause fuses breakers or O L s to operate and will decrease motor life When using a two speed starter Motor rotation must be the same at slow speed and high speed Single windin...

Page 10: ...ied at reduced speeds To benefit from these advantages it is important that the drive be installed correctly Marley supplies VFD and VFD controls specifically designed for our cool ing products If you...

Page 11: ...models include a single piece fan guard NC8405 through NC8414 models include a two piece fan guard Models with extended velocity recovery cylinders do not have fan guards Improper installation of the...

Page 12: ...s will prevent abnormal stress from being applied to the mechanical equipment and the electrical circuit components 5 Run the motor and observe the operation of the mechanical equipment Opera tion sho...

Page 13: ...that it is 75 open at that level Continue filling the system until the water reaches a level approximately 1 8 below the lip of the overflow If tower is equipped with a standard case face outlet conn...

Page 14: ...entoperation within these limits 6 Continue pump operation for about 15 minutes after which it is recom mended that the water system be drained flushed and refilled 7 While operating the condensing wa...

Page 15: ...cooling tower establishes only the cold water temperature attainable under any operating circumstance 2 Air wet bulb temperature Cold water temperature will also vary with the wet bulb temperature of...

Page 16: ...eraturebecomestoo cold switching the fan to half speed will cause the cold water temperature to rise stabilizing at a temperature a few degrees higher than before With a further reduction in water tem...

Page 17: ...below a mini mum allowable level say 36 F to 40 F If such low temperature operation is necessary or beneficial to your process establish the minimum allowable level as follows During the coldest days...

Page 18: ...on should not need to exceed 1 or 2 minutes Monitoring is required to determine the time required to melt accumulated ice Operating the fan in reverse at half speed for prolonged periods during subfre...

Page 19: ...ange of the internal riser and tap for a 20 bolt with sealing washer that will be used as a plug See figures below for drilling details Normally weep holes are plugged during tower operation and plugs...

Page 20: ...least the first eight weeks of operation pH should be controlled between 6 5 and 8 0 with hardness and alkalinity levels between 100 and 300 ppm expressed as CaCO3 Chlorine if used shall be added inte...

Page 21: ...surfaces should be flushed by use of a moderate pressure water nozzle being careful not to cause physical damage A reliable water treatment program should be installed and maintained Filtra tion devic...

Page 22: ...that secure the motor mount frame to the belt drive frame then loosen the retaining nuts on the two threaded rods and turn the threaded rods to apply proper tension Apply the same quantity of turns to...

Page 23: ...f each other and level within 1 2 1 8 in 12 in order to not adversely affect belt and sheave life Alignment can be achieved by placing a straight edge across the sheaves making sure that it is level a...

Page 24: ...s recommended that you read them thoroughly Where discrepancies may exist the separate Service Manuals will take precedence The following is recommended as a minimum routine of scheduled mainte nance...

Page 25: ...pment by hand grease the bearings until a bead forms around the seals Mobil SHC 460 grease is recommended Semi Annually If equipped check the belt tension and condition If equipped check Geareducer oi...

Page 26: ...ctions Motor located outside plenum option Open and lock out disconnect switch to make certain motor cannot be started 1 Remove guard as shown Opposite end motor bearing is accessible from outside the...

Page 27: ...s a need to have the tower painted If relatively bright metal can be exposed by cleaning consider that the galvanizing has remained effective Unless there is evidence of a generalized failure of the g...

Page 28: ...eds and maintain consistently optimum thermal performance capability They are available by contacting your Marley sales representative Replacementparts Acompletestockofpartsandcomponentsismaintained a...

Page 29: ...es if equipped Check for oil leaks in hoses or fittings x R x Belt drive if equipped Fan shaft bearing lubrication every 3 mo every 3 months every 3 months Check and tighten support fasteners x Check...

Page 30: ...anced voltage Check voltage and current of all three lines against nameplate values Overload Check fan blade pitch See Fan User Manual Check for drag in fan drivetrain as from damaged bearings Wrong m...

Page 31: ...foreign substance in circulating water system Insufficient blowown See Water Treatment section of this manual Water treatment deficiency Consult compentent water treating specialist See Water Treatmen...

Page 32: ...safety cages may also require field installation If installation details are not covered in the NC Field Installation Manual a separate installation drawing or manual for each purchased option is inc...

Reviews: