4
quick start guide
Connect incoming power here.
Panel requires 120VAC 1 phase,
6 amp power with ground.
If a makeup solenoid circuit is
provided, connect the solenoid
wires here at points 4A and 2A.
This circuit provides 120 VAC
power for the solenoid.
Connect alarm and/or cutoff
control wiring to the grey terminal
points.
Connect water level probe wiring
to the blue terminals. The probes
are generally located in the
cold water basin of the cooling
tower.
To avoid water getting into the
control panel, all conduit entries
should be into the bottom of the
enclosure.
Note: If the control panel is furnished with a water makeup selector switch
located on the right-hand side of the enclosure:
HAND:
position: Solenoid will energize.
OFF:
position: Solenoid is de-energized
AUTO:
Solenoid will operate depending on water level in relation to water probe height.
Summary of Contents for MARLEY LLC
Page 17: ...17...
Page 18: ...18...
Page 19: ...19...
Page 20: ...20...
Page 21: ...21...
Page 22: ...22...
Page 23: ...23...
Page 24: ...24...
Page 25: ...25...
Page 26: ...26...
Page 27: ...27...
Page 28: ...28...
Page 29: ...29...
Page 30: ...30...
Page 31: ...31...
Page 32: ...32...
Page 33: ...33...
Page 34: ...34...
Page 35: ...35...
Page 36: ...36...
Page 37: ...37...
Page 38: ...38...
Page 39: ...39...
Page 40: ...40...
Page 41: ...41...
Page 42: ...42...
Page 43: ...43...
Page 44: ...44...
Page 45: ...45...
Page 46: ......
Page 47: ......